Our trusted partners have made us the preferred ‘Environmental Services firm’ to cater to their ever growing needs and complexities – with a focus on Compliance, Water reuse, Zero Liquid Discharge and efficient disposal of hazardous waste.
Our ‘innovative’ and ‘cost effective solutions’ define us. Due to our in-depth knowledge and practical approach, we understand our customer’s pulse extremely well
WE DEAL IN ANY TYPE OF WASTE FEW OF THEM ARE:
We provide O&M, Spare and Chemical supply of:
Recycling can be done at
| Water Sample | Before Addition of Lime And Poly (pH) | Before Addition of Lime And Poly (TDS ppm) | Before Addition of Lime And Poly (COD mg/l) | After Addition of Lime and Poly (pH) | After Addition of Lime and Poly (TDS ppm) | After Addition of Lime and Poly (COD mg/l) | Flow Lime Consumption (Kg) |
|---|---|---|---|---|---|---|---|
| Normal TC CSY | 2.03 | 4160 | 116.928 | 7.1 | 3940 | 108.864 | 1797.5 |
| Normal Rayon AT | 2.23 | 2870 | 217.728 | 7.10 | 1950 | 213.696 | 1085 |
| Common Inlet | 2.65 | 2860 | 197.568 | 7.1 | 2740 | 185.472 | 4835.5 |
| CS2 | 6.15 | 2520 | 169.344 | 7.1 | 2460 | 56.448 | 750 |
| PSY Others | 2.3 | 2210 | 177.84 | 7.2 | 2090 | 134 | 1250 |
| Zn Inlet | 1.97 | 4580 | 254.016 | 9.0 | 4240 | 249.984 | 2925 |
| Sr. No. | Description | Screw press | Paddle dryer | Sludge Thickener |
|---|---|---|---|---|
| 1 | Capacity (ton) | 10 | 10 | 12 |
| 2 | Inlet moisture content (%) | 80 | 80 | 100 |
| 3 | Outlet moisture content (%) | <35 | <15 | 80 |
| 4 | TSS load | 5% | 5% | 5% |
| 5 | Power consumption (kwh) | 3.2 | 11 | 3.2 |
| 6 | Power Cost per day (₹8/kw) | 512 | 1760 | 512 |
| 7 | Material of construction | SS 304 | SS 304 | Existing |
| 8 | Steam consumption | NA | 7kg/sq cm @ 480°C | NA |
| 9 | Steam Cost (₹2/kg) | NA | 19200 | NA |
| 10 | Chemical consumption (polyelectrolyte 0.1-0.2%) kg | 10 | NA | 5 |
| 11 | Chemical cost (₹250/kg) | 2500 | NA | 1250 |
| 12 | Outlet dry sludge (kg/hr) | 250 | 99 | 500 |
| 13 | Total Operating Cost | 3012 | 20960 | 1762 |
| 14 | Disposal cost to MWML (₹4 per kg) | 20000 | 7920 | 40000 |
| 15 | Net cost for disposal ₹/day | 23012 | 28880 | 41762 |
| 16 | Net cost for disposal ₹/Annum | 8399380 | 10541200 | 15243130 |
| 17 | Major Disadvantages | – Cost, Boiler, Condenser | Higher moisture requirement content |